China Railway 14th Bureau Nanjing Heyan Road Project: winner of super-large diameter TBM cutters

内容01.jpg

Profile: 

The project is a highway tunnel undercrossing the Changjiang River with the full length of 3000 meters. It used the TBM made by HK with the diameter of 15.07 meters. It mainly crosses through the formations of moderately weathered breccia and moderately weathered sandstone.

Difficulty: 

Extremely stable quality was a necessary, while large-diameter-TMB was used under high water pressure.

Measures and effects: 

In the early stage, cutters provided by four manufacturers were compared. Our cutters stood out and were highly recognized by the user with steady quality. Finally, the user determined our company as the main supplier. 

内容03.jpg



Letter of Thanks

内容04.jpg


Management Department of Heyan Road Underwater Tunnel South Section Tunnel Project Bid No. A2 Project

Letter of Thanks


In the Heyan Road Underwater Tunnel South Section Tunnel Project Bid No. A2 Project undertaken by our company, the tunnel crosses through (2) 5 fine silty sand, (4) 1 medium coarse sand, (8) 2j intensely weathered breccia, (8) 3j moderately weathered breccias, (8) 3s1 moderately weathered glutenite, (9) 3 moderately weathered limestone and (7) 3s1 moderately weathered pebbly sandstone and glutenite. The rock formation is complete. There are karst areas, flushes, and fracture zones in the interval. Such formation requires the cutters with high impact resistance and wear resistance.


Because of our Heyan Road Project, your company organized for a few times the technical team to visit the field, communicate with us about cutter selection, technical exchange, product optimization and R&D on new products, make summaries and have discussions, and designed and produced new cutters adaptable to formation change on time. With stable quality, efficient performance and low failure rate, your cutters represent high formation adaptability, laying a solid foundation for efficient advancement.


With the operation system integrating R&D, design, manufacturing and technical services and the efficient service mechanism, your company provided us the services like a cutter keeper. We sincerely hope to continue cooperation with you in the future projects and make great achievements together.


China Railway 14th Bureau Group Co., Ltd.


Management Department of Heyan Road Underwater Tunnel South Section Tunnel Project Bid No. A2 Project

October 2021